Nothing is too little to be noted on as-built drawings, but the items that we prefer to put on them include the following: You can also store different versions of plans, which can be very useful for as-builts. You can store construction drawings and plans using LetsBuild. Like that, as-built drawings are as effective as they should be. This technology ensures that nothing minor or major is missed.
AS BUILT DRAWING STANDARDS SOFTWARE
Thankfully, construction technology and software have made it possible for changes to be noted immediately, as they are being done so that a lot of the work is already completed before the project is finished. Read more: Construction reports and reporting: An in-depth guide Without these notes, it is possible for certain items to be missed, which can be detrimental in the future. Keeping a detailed track of all the notes and documents generated during the building process should be a priority as it can contribute to the creation of the as-built drawings. Of course, the contractor and subcontractors can also add to the changes, as they are familiar with the project and the alterations that are needed in the course of the entire construction process. The as-built drawings are normally completed by the architect or designer of the building because they are familiar with the original specifications and can record the changes properly. As-built drawings are also referred to as record drawings.
![as built drawing standards as built drawing standards](https://designassistpartners.com.au/wp-content/uploads/2014/09/Mechanical-Drawing.jpg)
Those drawings are the revised version, which includes every change that was made in the specifications, the exact dimensions, the location of all the elements, and any extra work. Instead, the contractor needs to submit the as-built drawings. The drawings that are first completed for a planned construction project are not the ones that are needed once the project is finished. The major purpose of an as-built drawing is to record any modification made during the building process that deviates from the original design.
![as built drawing standards as built drawing standards](https://constructionblog.autodesk.com/wp-content/uploads/2020/09/1920x1080-blog-1.jpg)
It doesn’t matter how minor the alterations are, as-built drawings envision the modifications being made and help anticipate and forecast its effect to the final building result. They serve as copies or recreations of how the project is constructed, and pinpoint all changes made as it is being built.Ĭonstruction projects, regardless of their size, go through multiple modifications, adjustments, and changes before their completion. They reflect all the changes made during the construction process.”Īs-built drawings are a very important component of a construction project. “ As-built drawings are revised sets of drawings submitted by a contractor upon the completion of a particular job.